For parking lot lighting contractors

Last updated 2026-11-05 · parking lots · free trial

A bid should not wait days for a photometric. Place the poles on your site plan, choose the fixtures you would quote, and get the luminaire and aiming that meet your targets, the illuminance on every grid point and every input used. Free trial: 30 calculations per organization, up to 5 per day. Calculation time depends on candidates, aiming range and site size; no turnaround is promised.

A manufacturer's free layout, or run it yourself

Manufacturer free-layout serviceRunnax
TurnaroundPublished turnaround for free manufacturer and distributor layouts: typically 1–3 business daysFree sign-up; upload your IES and site image and run it yourself, no waiting for someone to draw it. Calculation time depends on the candidates and aiming range; at peak times jobs queue.
Whose fixturesThat manufacturer's catalog onlyYour own IES files

Turnaround as published by Archipelago Lighting (team layout, 3 business days), Jarvis Lighting (2–3 business days) and LED Lighting Supply (2–3 days outdoor); LED Light Expert (1–3 business days) and Commercial LED Lights (24–48 h) from search snippets; all checked 2026-10-16.

Fewer poles to price (research engine example)

Research — Runnax Engine study. This is the research engine searching regular pole arrays. The hosted tool has its own layout search inside the areas you allow, for new lots or added poles. What was compared with AGi32, and where it ran.

On the same 300 × 200 ft lot, Archipelago's free online tool (run 2026-10-16) returned 12 × 150 W fixtures, an average of 3.1 fc against the 2.2 fc asked (41 % over), and marks its own results unvalidated. The research engine met a 0.2 fc minimum with 8 × 166 W, poles only on the islands. Their tool asks for an average target and the engine searched on a minimum, so this compares capability, not scores. Pole counts for other lot sizes: how many light poles a parking lot needs.

What you put in, what you get

Replacing fixtures on poles that are already there? LED retrofit on existing poles.

Requests for research-engine layouts are paused (details). What paid plans cost: photometric plan cost.

Already have a layout?

If a supplier or engineer already gave you a parking-lot layout, ask them for the pole positions, heights and IES files and rebuild it in the hosted tool to compare the horizontal results. The AGi32 second opinion, a research check that recomputed .AGI files, is paused and takes no files.

What it is not

Questions

Can I use it to price a parking-lot lighting bid?

Yes. You get a pole table with positions, heights and luminaires to count poles and fixtures from, plus the point-by-point results against your targets. It is a design and quoting tool, not a stamped plan.

Can I compare fixtures from different manufacturers?

Yes, within the catalog the tool is set up with. Choose 2 to 4 candidates and the aiming ranges you allow; the tool computes each one on the poles you placed and keeps the one that meets your targets, or says none does.

What does it cost?

The trial is free: 30 calculations per organization, up to 5 per day. Paid plans will have their own terms, which we share before you are charged anything.

I already have a layout from a supplier. Can you check it?

Not as a file check: intake for the AGi32 second opinion and the past-project check is paused, so we are not taking files. You can rebuild the layout in the hosted tool, same poles, heights and IES files, and compare the horizontal results yourself.

Start free trial