To read a photometric plan, start with the summary table: compare the minimum and the Max:Min ratio of each area with the targets the lot must meet (for parking lots, the IES reference is 0.2 fc minimum and Max:Min 20:1 or less). Then check what the numbers rest on: the light loss factor, the luminaire schedule (model, IES file, mounting height) and whether the calculation grid covers the whole area.

What does a photometric plan show?

A site drawing with each pole and fixture, the calculated light level in foot-candles (fc) at points on a grid, a luminaire schedule, and a summary table per calculation area. The DOE parking lot guide lists the usual summary metrics: average, maximum and minimum fc, average:minimum, maximum:minimum (DOE FEMP Parking Lot Lighting Guide, p. 15). Some plans add points on the property line or vertical grids; see parking lot lighting requirements.

Which numbers in the summary table matter?

The ones your target is written in. For parking lots, IES RP-8-25 (with Errata 1 and 2) sets a minimum of 0.2 fc on the pavement and a Max:Min of 20:1 or less (requirements and sources). Local codes or your customer may set other values, sometimes as an average; use those if they apply.

Can a plan meet the minimum and still fail?

Yes. In one DOE design example the minimum was 0.3 fc, above the 0.2 fc minimum, but Max:Min was 35:1, well past 20:1; a second fixture on the same layout reached 14:1 (DOE FEMP guide, pp. 15–16). Read every target, not only the one that passes.

Want to check a plan you were sent? Rebuild it with the same poles and IES files in the free trial: 30 calculations per organization, up to 5 per day. Have the site plan ready as a PNG or JPEG (what image works).

Start free trial · Ask about your lot first

What is the light loss factor (LLF), and why check it?

LLF scales the calculated light down for lamp and dirt depreciation over time. A plan calculated without it (LLF 1.0) shows initial levels; the DOE guide notes such calculations “do not include light loss factors” and says LLF should be determined per site (DOE FEMP guide, p. 15). Example: a real AGi32 parking-lot file we recomputed used LLF 1.0 and averaged 1.24 fc; at 0.9 it would be about 1.11 fc (sample, research figures). If a plan only just meets its target at LLF 1.0, ask why.

What should I check on the luminaire schedule?

That the model, IES file, wattage and mounting height in the schedule match what you are buying and the poles you have. The calculated levels are only valid for that fixture and that height. For an existing lot, also check that the poles on the drawing stand where the real poles stand.

What should I ask for if I want to check the plan?

The luminaire IES files, mounting heights, light loss factor and the calculation grid (spacing and the areas it covers) (photometric plan cost). Without them nobody can repeat the calculation.

How can I check a photometric plan someone sent me?

Rebuild it: same pole positions, same IES files, same mounting heights and light loss factor, and compare the horizontal levels area by area. You can do that in any lighting calculation program. In Runnax you upload the site plan as a PNG or JPEG, set the scale with three lines of known length, draw the areas, place the poles by hand and assign each pole its fixture, using the same IES files (each is checked for format before you can enable it). Each area is judged against its own targets, and you get a result page, a PDF report and point-by-point CSVs to compare with the plan.

On a real parking-lot project our engine agreed with AGi32 at 473 of 473 grid points, largest difference 0.13 % (horizontal, given poles; a research run, not yet repeated in the hosted tool; reported, not independently reviewed): verification. Results are a simulation, not a field measurement or a compliance statement.

Can Runnax open my photometric plan PDF or AGi32 file?

No. It reads PNG and JPEG images only, and you trace the areas and poles yourself. Export or screenshot the site plan from the PDF, and take mounting heights and fixtures from the luminaire schedule.

Who this is for

Contractors checking a manufacturer's free layout before quoting (for contractors), and owners who want to understand a plan before they approve it.

Check it on your own lot. Free trial with your own IES files: 30 calculations per organization, up to 5 per day. Have the site plan ready as a PNG or JPEG (what image works).