Sample: a past research-engine check
In this check the customer's AGi32 file of a parking lot, 15 poles at 25 ft with 75 W LED area lights, was recomputed by Runnax Engine: it read the fixtures, aiming and calculation points straight from the file and recalculated every point on its own, in about 4 seconds.
1 · Zone by zone
| Zone | AGi32 avg / min | Runnax Engine avg / min | Difference | Target | Meets it |
|---|---|---|---|---|---|
| Parking area, horizontal at grade (271 points) | 1.237 / 0.395 fc | 1.237 / 0.395 fc | 0.01 % | Eavg ≥ 1.0 fc, Avg:Min ≤ 3.3 | Yes |
| Vertical at 5 ft, facing 71° (495 points) | 0.553 / 0.000 fc | 0.553 / 0.000 fc | 0.03 % | none given | – |
| Vertical at 5 ft, facing 251° (495 points) | 0.485 / 0.000 fc | 0.485 / 0.000 fc | 0.03 % | none given | – |
Foot-candles, direct light. Point by point, the largest difference on the parking area is 0.3 % of its average. The vertical grids in this file run into the corners of the lot, which is why their minimum is 0. Research figures, 2026-10-16.
2 · What the file assumes
Light loss factor 1.0. No lamp or dirt depreciation, so these are initial levels. At a typical 0.9 the average drops to about 1.11 fc: still above 1.0 fc, with less room. Some reviewers ask for the factor to be stated on the plan.
3 · Inputs on record
- File: the customer's .AGI (15 luminaires, 3 calculation zones)
- Fixtures: 75 W LED area light, two optics, photometry as stored in the file
- Mounting: 25 ft, 3 ft arm, tilt 0–10° as in the file
- Light loss factor: 1.0, from the file
- Targets: Eavg ≥ 1.0 fc and Avg:Min ≤ 3.3, from the customer's request
- Method: point-by-point direct illuminance, the same basis as AGi32's exterior calculation
What the hosted tool gives you
The hosted tool at sim.runnax.com does not read AGi32 files. On an uploaded site image you draw the areas to light, then either place the poles or draw where poles may and may not go and let it search for the fewest new poles (it says whether every layout with fewer poles was tried); upload or choose luminaire IES files and enter the illuminance requirement; it calculates point-by-point horizontal illuminance for every area, tries the candidate luminaires and aimings you allow, and returns the combination that meets the requirement, or says none does. You get a report page, a PDF and a download package. Checked against AGi32: 473 of 473 points within 0.13 %, horizontal illuminance on given poles, a research run of our engine on a real parking-lot project, not yet repeated in the hosted tool; reported, not independently reviewed (Verification). Results are for evaluation, not a field measurement or a standards certification.
Direct light only. Not a code-compliance statement and not a construction approval; the engineer of record signs the design.